Assistant Project Manager
  • Master of science in Project Management (MSPM) with over 4 years of Experience in coordinating variety of projects, functions and Logistics components (e.g. Supply Chain Management, Project Management, Event Management, Administration and Security Operations, etc.) for the purpose of completing activities and/or delivering services in a timely manner.
    • Goal-oriented logistics and supply chain, end-to-end supply chain and program management expertise that directly results in efficiency improvements and cost savings.
  • Taking care of all warehouse delivery to site and checking at the time of delivery according to site configuration
  • Managed projects & programs simultaneously while maintaining quality and meeting customer expectations.
  • Proficient with PMI methodology and able to define and implement best practices throughout the project life cycle.

• Proven record in achieving proper balance of projects triple constrains (scope, cost and schedule)

• Implementation of modern management practices, reporting systems, client-supplier relations, etc.

• Experienced in managing cross-functional teams and business partners in a global and multicultural environment.

• Strong mentoring skills, capable of leading and motivating individuals to maximize productivity while fostering cohesive teams in a virtual environment

Last Resume Update April 28, 2018
Address Jhang, Pakistan
E-mail Locked
Phone Number Locked

Experience

Wajda International , Dubai, United Arab Emirates
RAN Implementation Engineer
Jun 2014 - Mar 2016

• Managing Radio Network Activity on ( Wajda – Etisalat Mega Swap Project & DU Roll out Project )
• Responsible to Setup layout ; work organization chart; procedures such as SOP Planning, Organizing and Controlling of Project work and over-all operations.
• Responsible to implement the project work as per scope time cost and quality.
• Managing end to end Radio network swap for 2G, 3G and LTE of Etisalat Project.
• Troubleshooting and Resolving Coverage, Traffic reduction, traffic imbalance issues in IBS, Outdoor and Remote sites.
• Interfacing with the customer on daily basis at technical level, updating changes in the network solution, design, and configurations.
• Commissioning and integrating the 3G-LTE sites through Huawei Software (WEB LMT and WDT) software. Working with the RFM teams on TSSR, Supervision of survey execution and review/update the TSSR’s before providing to Customer.
• Measure, track and monitor all assigned Swap Project KPI’s (Key Performance Indicators).
• Responsible for PS data (GPRS/ EDGE) Monitoring and dimensioning and 2G/3G high valued customer complaints handling regarding network QoS.
• Physical inspection, Audit, done to measure the work progress and take preventive action if needed.
Key Highlights:
• Execution Process ( Implement, Radio Network, Design infrastructure )
• Operations and Maintenance
• Integration and Reporting
• Quality Assurance & Quality Control

ZTE Telecom , Pakistan
Team Lead Engineer
May 2013 - Oct 2013

• Supervising Installations and commissioning of NEC iPasolink 200, iPasolink400 and iPasolink1000 MW Links including 1+0, 1+1 HSB, SD, XPIC and XPIC HSB configurations
• Configuring Ethernet Services including DCN Implementation, VLAN configuration, QoS.
• Complete Media Clearance till BSC.
• E2E Media verification from site to BSC through Ping Tests.
• Monitoring Alarms on NEC PNMSJ Server client and rectification of these alarms.
• Troubleshooting of NEC iPasolink200, iPasolink400 and iPasolink1000.
• Providing Technical Support to teams on site.
• Installation, Commissioning and Troubleshooting of ZTE SDR BTS8700, BTS8800, BTS8900 Micro Macro IBS, Mini-shelter.
• Leading 3G Project implementation in Central region as Team Lead.
• - Successfully deliver 3G Phase0, Phase1 & Phase2 project for Telenor Pakistan in Lahore Pakistan region within given timelines and as per customer satisfactions.
• - Strong follow up with ZTE & Subcon team for smooth execution of RAN & MW surveys for 3G Phase1 project. Coordination with ZTE Site Design team, TP RF team and TP Power team to accept surveys as per customer demand & requirements.
• -RAN TI planning, Risk Analysis, Developing TI scenarios, SMR/EDO generation, ways to handle TI issues for smooth RAN 3G project executions.
• - Responsible for end to end project delivery from project planning to complete scope closing i.e. from equipment issuance to FAC of site.
• -Review Plan and Progress of Projects on daily, weekly and monthly basis; identifying the loopholes, risks providing solutions and making escalations where required and Reporting to Management and Customer.
• -Responsible for the effective synchronized flow of information among different technical and non-technical participants in project activities.
• - Responsible for Acceptance of 3G sites with customer leading to PAC and FAC

GrenTech Telecom Pvt, Ltd , Pakistan
Site Engineer
Apr 2012 - Apr 2013

• Worked as Site Engineer on CMPak & Telenor Project
• 3G SDR Swap for Installing ZXSDR 8700 ZXSDR 8800 ,ZXSDR 8900 and its configuration
• Rectification of service, Installation of Rectifier W301,ZTE battery bank
• Installation of RRU (Single band sector R8882 ,Dual band sector MBR R8882, Single band sector R8860E,R8881) effecting alarms after on-air the swap site
• Perform indoor & outdoor installation of ZTE sites
• Check the VSWR and Return losses of RRU & RSU solution sites.
• Worked on GSM, SDR, BTS and software ZTE-LMT-MISU-EISU-GISU
• Monitor and handle alarms appearing on the cards of BBU,CSU,LPU
• Site Alarm patching and Pre-swap and post swap alarm testing & verified of both internal and external alarms from NOC
• Handle the problem come on RRU,RSU and Optical fiber
• Perform maintenance regarding Power equipment like Generators, Rectifiers, Battery Test, Distribution Panel and ATS
• Excellent handling skills of the equipment
• Installation, Configuration monitoring and Troubleshooting of ZTE BSS elements and it’s commissioning
• Installation and commissioning of NEC iPassolink Series iPaso 200,iPaso 400 & iPaso 1000 and configuration
• Enabling services VLAN, QOS, Bridge setting, Ethernet port setting, Services status setting, Ethernet port setting
• Microwave Transmission system factors such as RSL,BER
• ZTE Hard & Soft cutover
• Soft and hard Expansion of SDR swapped sites
• Daily reports of Network Emergency Reports, Outage Reports, Weekly PM Checklists, Faulty Equipment Report, Weak Battery Report, Civil Work condition Report
• Prepare the document of site including dismantling BOQ,New BOQ, SDR ATP, MW ATP

Education

Bahria University Lahore campus
Master of Science in Project Management
Oct 2016 - Feb 2018

Practically implement PMO in Private Organization and have a vast knowledge of PMBOK.
subject studied
Project Quality Management
Project Monitoring , Evaluation and control
Project Human Resource
Project Risk Management
Project Planning and scheduling and time Management

Government College University Faisalabad
BSc Telecommunication Engineering
Oct 2007 - Dec 2011

Four years Practically Work in Telecommunication Industry as Transmission Engineer (NEC) , RAN Engineer ,

Contact Candidate

Login or register as Employer to contact this candidate.